Skip to content

Nighttime Maintenance Scheduled for 13th Street Bridge in Paso Robles

Nighttime Maintenance Scheduled for 13th Street Bridge in Paso Robles

Nighttime Maintenance Scheduled for 13th Street Bridge in Paso Robles

nighttime-construction-scaled

This maintenance activity is scheduled to start at 9:00 PM on April 16th, 2024 and should take between 3-4 hours.

 

Paso Robles, CA - The City of Paso Robles' Streets Division and Water Department teams are set to conduct essential nighttime maintenance on the 13th Street Bridge. This maintenance activity is scheduled to start at 9:00 PM on April 16th, 2024 and should take between 3-4 hours. 

The primary objective of this maintenance operation is to address the noticeable bump present on each side of the bridge abutments. To ensure minimal disruption to traffic flow, city staff will implement a lane closure strategy, allowing one lane to remain open at all times.

"We understand the importance of maintaining our infrastructure while prioritizing the safety and convenience of our residents and commuters," said David LaCaro, Public Works Operations Manager. "By conducting this maintenance at 9:00 PM, we aim to minimize inconvenience to travelers and ensure the safety of our dedicated City staff."

Individuals with inquiries regarding the maintenance operation can contact the City of Paso Robles Public Works Department at 805.237.3861.

The City of Paso Robles appreciates the patience and cooperation of the community as we work to enhance the functionality and safety of our roadways and bridges.

Scroll To Top